Skip Headers

Oracle9i Database Reference
Release 2 (9.2)

Part Number A96536-02
Go to Documentation Home
Home
Go to Book List
Book List
Go to Table of Contents
Contents
Go to Index
Index
Go to Master Index
Master Index
Go to Feedback page
Feedback

Go to previous page Go to next page
View PDF

DBA_RSRC_PLAN_DIRECTIVES

DBA_RSRC_PLAN_DIRECTIVES lists all resource plan directives in the database.

See Also:
Column Datatype Description

PLAN

VARCHAR2(30)

Name of the plan to which this directive belongs

GROUP_OR_SUBPLAN

VARCHAR2(30)

Name of the consumer group or subplan referred to

TYPE

VARCHAR2(14)

Whether GROUP_OR_SUBPLAN refers to a consumer group or plan

CPU_P1

NUMBER

First parameter for the CPU resource allocation method

CPU_P2

NUMBER

Second parameter for the CPU resource allocation method

CPU_P3

NUMBER

Third parameter for the CPU resource allocation method

CPU_P4

NUMBER

Fourth parameter for the CPU resource allocation method

CPU_P5

NUMBER

Fifth parameter for the CPU resource allocation method

CPU_P6

NUMBER

Sixth parameter for the CPU resource allocation method

CPU_P7

NUMBER

Seventh parameter for the CPU resource allocation method

CPU_P8

NUMBER

Eighth parameter for the CPU resource allocation method

ACTIVE_SESS_POOL_P1

NUMBER

First parameter for the active session pool resource allocation method

QUEUING_P1

NUMBER

First parameter for the queuing resource allocation method

PARALLEL_DEGREE_LIMIT_P1

NUMBER

First parameter for the parallel degree limit resource allocation method

SWITCH_GROUP

VARCHAR2(30)

Group to switch into

SWITCH_TIME

NUMBER

Amount of run time before session is automatically switched

SWITCH_ESTIMATE

VARCHAR2(5)

(TRUE/FALSE) TRUE indicates estimated execution time should be used for switch criteria

MAX_EST_EXEC_TIME

NUMBER

First parameter for the maximum estimated execution time

UNDO_POOL

NUMBER

Undo pool size for the consumer group

COMMENTS

VARCHAR2(2000)

Text comment on the plan directive

STATUS

VARCHAR2(30)

Status of the directive: PENDING if it is part of the pending area, ACTIVE otherwise

MANDATORY

VARCHAR2(3)

Whether the plan is mandatory (YES | NO)